This page has been prepared for renewable energy producers operating RES installations in cooperation with Respect Energy. It contains key information on the correct and efficient reporting of outages and power limitations in the ONS system, as well as the rules for creating REMIT notifications.
Planned maintenance reduces the installation’s capacity from 10 MW to 8 MW on 21.09.2025 between 08:00–12:00. A power limitation of 2 MW should be reported.
If the duration or extent of the limitation changes, the notification must be updated accordingly.